Reformasi Perencanaan Sistem Kelistrikan untuk Integrasi 100 GW PLTS: Analisis terhadap Biaya, Keandalan, dan Transisi Energi di Jawa-Madura-Bali (JAMALI)

26 November 2026

-

Admin CERAH

Electricity Reform for 100 GW Solar PV Integration

The ambitious 100 GWp solar PV target launched by the government in August 2026 requires electricity planning reform. Electricity Supply Business Plan (RUPTL) 2025-2034 only accommodates 17.1 GW of solar PV and has not yet included coal power plant retirement plans.

Based on modeling results, integrating 63 GW of solar PV in the Java–Madura–Bali (JAMALI) system by 2034 can absorb solar energy without power supply shortfalls, cut generation costs by 16%, reduce CO2 emissions by 18%, and save up to USD 5.7 billion in new gas plant investments. To achieve this, a series of regulations must be aligned promptly alongside strict evaluations of continued coal power plant operations.

Publication details

Published: 26 November 2026

You may also like

Perbankan Indonesia di Persimpangan Transisi Energi Terbarukan

Indonesia’s Banking Sector in Energy Transition

Indonesia’s Banking Sector at the Crossroads of Renewable Energy Transition An Analysis of Expert and Opinion Leader Perceptions in Indonesia

31 October 2025

Alasan Energi Baru Tak Bisa Diatur Bersama Energi Terbarukan

Alasan Energi Baru Tak Bisa Diatur Bersama Energi Terbarukan

Menyusun regulasi bersama untuk “energi baru” dan “energi terbarukan” sebagaimana dimuat dalam Rancangan Undang-undang (RUU) EBT dinilai sejumlah kalangan cukup...

10 May 2022

Teknologi Bersih di Daerah Terpencil Pulihkan Ekonomi Lokal

Teknologi Bersih di Daerah Terpencil Pulihkan Ekonomi Lokal

Laporan terbaru Institute for Essential Services Reform (IESR) menyebutkan, kunci perkembangan energi terbarukan Indonesia adalah pemulihan kelistrikan di daera...

08 June 2021

footer yayasan