This study examines hybrid coal-fired power plants (PLTU hybrid), which risk prolonging reliance on coal and generating up to 1.03 million tons of CO2 emissions annually. In contrast, a combination of solar photovoltaic (PV) power plants and battery energy storage systems (BESS) proves more competitive in the long term. Although the initial investment is higher, the cumulative costs of a solar-plus-BESS system will become lower than those of a hybrid coal-fired plant starting in 2048.
To realize an energy transition, the government and PLN need to re-evaluate hybrid coal-fired power plant projects—such as the Kalselteng 4 plant—align the revised Electricity Supply Business Plan (RUPTL) with the target of 100 GWp of solar capacity, and shift financial support toward clean energy infrastructure.)