Potensi Penghematan Negara dari Penghentian Pembangunan PLTU Baru

15 October 2026

-

Admin CERAH

Potential Savings from Halting New Coal Plant Construction

This study examines the economic and fiscal implications of proceeding with three delayed coal-fired power plant projects—Sumut-1, Jambi-1, and Jambi-2—which are still included in the 2025–2034 Long-Term Power Supply Plan (RUPTL). Modeling results indicate that the continuation of these three projects has the potential to increase electricity supply costs by Rp144.22 trillion during the 2025–2045 period and add to the burden of electricity subsidies and compensation by up to Rp149.51 trillion from 2028 to 2045. However, any decision to halt these projects must also take into account the adequacy of supply and the reliability of the electricity system. This study calls for project evaluations based on actual conditions, fiscal risk assessments, and comparisons with alternatives such as renewable energy, energy storage, and grid reinforcement.

Publication details

Published: 15 October 2026

You may also like

Reformasi DBH Minerba untuk Hilirisasi Mineral Kritis yang Berkeadilan

Reforming Mineral Revenue Sharing for Critical Minerals

Reforming Mineral Revenue Sharing for Critical Minerals Downstreaming

04 August 2026

IEEFA menilai pengembangan kendaraan listrik di Indonesia saat ini belum sesuai dengan arah bisnis dari para pemain di industri otomotif.

Pengembangan Kendaran Listrik Masih Lamban

IEEFA menilai pengembangan kendaraan listrik di Indonesia saat ini belum sesuai dengan arah bisnis dari para pemain di industri otomotif.

06 February 2023

footer yayasan