Reformasi Perencanaan Sistem Kelistrikan untuk Integrasi 100 GW PLTS: Analisis terhadap Biaya, Keandalan, dan Transisi Energi di Jawa-Madura-Bali (JAMALI)

26 November 2026

-

Admin CERAH

Electricity Reform for 100 GW Solar PV Integration

The ambitious 100 GWp solar PV target launched by the government in August 2026 requires electricity planning reform. Electricity Supply Business Plan (RUPTL) 2025-2034 only accommodates 17.1 GW of solar PV and has not yet included coal power plant retirement plans.

Based on modeling results, integrating 63 GW of solar PV in the Java–Madura–Bali (JAMALI) system by 2034 can absorb solar energy without power supply shortfalls, cut generation costs by 16%, reduce CO2 emissions by 18%, and save up to USD 5.7 billion in new gas plant investments. To achieve this, a series of regulations must be aligned promptly alongside strict evaluations of continued coal power plant operations.

Publication details

Published: 26 November 2026

You may also like

Energi Bersih Perkuat Daya Saing Nelayan Pesisir Timur

Energi Bersih Perkuat Daya Saing Nelayan Pesisir Timur

Nelayan di Sulamu, Nusa Tenggara Timur (NTT) termasuk yang paling rentan dalam persaingan industri perikanan nasional.

25 May 2021

Pandemi, Perintis Jalan menuju Ekonomi yang Lebih Hijau

Pandemi, Perintis Jalan menuju Ekonomi yang Lebih Hijau

Pandemi Covid-19 mengantarkan manusia kepada suatu pemahaman baru akan dunia yang saling berhubungan.

31 March 2021

Survei Kesiapan Daerah untuk Transisi Energi

Regional Readiness for the Energy Transition Survey

The transition toward clean and sustainable energy has become an urgent necessity for Indonesia. Although the government has set fairly ambitious national targe...

26 November 2025

footer yayasan