Batu Bara ke Gas: Solusi Transisi Energi atau Beban Ekonomi?

07 August 2025

-

Sartika Nur Shalati

Coal to Gas: Energy Transition Solution or Economic Burden?

The 2025–2034 Electricity Supply Business Plan (RUPTL) still includes fossil fuels in the national power generation mix, totaling 16.6 GW, with 10.3 GW of that coming from gas-fired power plants. Although gas is often considered “cleaner” than coal, CERAH’s analysis shows that the life-cycle emissions of gas remain high—primarily due to methane leakage during extraction, liquefaction, and LNG distribution processes. The carbon dioxide emissions from these gas plants are estimated to reach 10–11 million tons of CO₂ per year, potentially hindering the achievement of the Net Zero Emission 2060 target and prolonging Indonesia’s dependence on fossil energy.

From a fiscal perspective, the expansion of gas-fired power plants poses a significant burden on the state budget. The cost of gas procurement by PLN, combined with the gap between the Special Natural Gas Price (HGBT) and market prices—which is subsidized by the government—is projected to total IDR 155.8 trillion annually by 2034. At the same time, the development of gas infrastructure, such as LNG terminals, storage tanks, and pipeline networks, will require trillions of rupiah in investment, yet remains at risk of becoming stranded assets due to low utilization and the increasing competitiveness of renewable energy.

This briefing note aims to provide a critical analysis of the role of gas in the 2025–2034 RUPTL and to advocate for a strategic and progressive review of national energy policy, so that Indonesia avoids both fiscal burdens and climate traps associated with long-term fossil fuel investments.

Publication details

Published: 07 August 2025

You may also like

Riset Dampak Krisis Iklim Terhadap Kopi dan Beras

Research on the Impact of Climate Crisis on Coffee and Rice

Agricultural productivity of rice and coffee commodities in Indonesia is expected to decline as a result of climate change. The findings were revealed in the la...

15 December 2022

PLTU Cirebon-1./Bloomberg-Muhammad Fadli

Melebihi Dana JETP, Transisi Energi Butuh Rp500 Triliun

Pemerintah menyepakati rencana investasi transisi energi komprehensif dalam program JETP senilai US$20 miliar dalam 3-5 tahun ke depan.

21 August 2023

Sebuah kendaraan listrik sedang mengisi daya di SPKLU Gambir, Jakarta, 19 Juli 2022. TEMPO/Wawan Priyanto

Kendaraan Listrik di Indonesia Belum Sesuai Bisnis Produsen

Pengembangan kendaraan listrik di Indonesia saat ini dianggap belum sesuai dengan arah bisnis dari para pemain industri otomotif.

06 February 2023

footer yayasan