Risiko Stranded Assets dari Rencana Penambahan PLTU Baru

15 October 2026

-

Admin CERAH

The Risk of Stranded Assets from Plans to Build New CFPPs

This study analyzes the financial viability and stranded asset risks of three delayed coal-fired power plant projects: Sumut-1, Jambi-1, and Jambi-2. The modeling results show that all three are very close to the economic viability threshold. Sumut-1 has not yet met the viability threshold, while Jambi-1 and Jambi-2 are only marginally viable. Even minor changes in coal prices, electricity rates, operational performance, and financing costs could render the projects unfeasible. This study emphasizes the importance of conducting a financial reevaluation, sensitivity analysis, and validation of actual data before proceeding with construction, in order to minimize investment risks and the potential for stranded assets during the energy transition.

Publication details

Published: 15 October 2026

You may also like

Tak Ada Tempat untuk Nuklir di RUU EBT

Tak Ada Tempat untuk Nuklir di RUU EBT

Pro dan kontra terkait pemanfaatan nuklir sebagai sumber pembangkit listrik terus terjadi.

10 March 2021

Analis energi IEEFA Putra Adhiguna saat peluncuran laporan "Electrifying Indonesia's Road Transport" di Jakarta, Senin (6/2/2023). ANTARA/Benardy Ferdiansyah

Pengembangan EV Indonesia Belum Sesuai Bisnis Produsen

IEEFA menilai pengembangan kendaraan listrik di Indonesia saat ini belum sesuai dengan arah bisnis dari para pemain di industri otomotif.

06 February 2023

Benarkah Menunda Pensiun Dini PLTU Bisa Menguntungkan Perekonomian Negara?

Early Coal Plant Retirement: Economic Opportunity?

Retiring coal plants early can save trillions and lives. Is delaying the transition a risk to Indonesia’s economy and public health?

09 July 2025

footer yayasan