Risiko Stranded Assets dari Rencana Penambahan PLTU Baru

15 October 2026

-

Admin CERAH

The Risk of Stranded Assets from Plans to Build New CFPPs

This study analyzes the financial viability and stranded asset risks of three delayed coal-fired power plant projects: Sumut-1, Jambi-1, and Jambi-2. The modeling results show that all three are very close to the economic viability threshold. Sumut-1 has not yet met the viability threshold, while Jambi-1 and Jambi-2 are only marginally viable. Even minor changes in coal prices, electricity rates, operational performance, and financing costs could render the projects unfeasible. This study emphasizes the importance of conducting a financial reevaluation, sensitivity analysis, and validation of actual data before proceeding with construction, in order to minimize investment risks and the potential for stranded assets during the energy transition.

Publication details

Published: 15 October 2026

You may also like

Wakil Ketua Komisi VII DPR Eddy Soeparno. (Foto: Theresia Agatha/VOI)

5 Ekosistem Ini Vital Untuk Kembangkan Kendaraan Listrik RI

Wakil Ketua Komisi VII DPR Eddy Soeparno mengatakan, terdapat lima ekosistem yang perlu diperhatikan dalam pengembangan kendaraan listrik.

06 February 2023

Ilustrasi pembangkit listrik tenaga bayu (PLTB). (Sumber: pexels.com)

Riset EY: Pendanaan Bukan Hambatan Utama Bauran EBT RI

Sebuah riset lembaga audit internasional Ernst and Young (EY) melaporkan bahwa isu pendanaan bukan menjadi hambatan utama dalam pengembangan energi baru dan ter...

24 November 2023

PLTU dengan polusi yang mengotori langit

Public Perception of PLTU Early Retirement Policy

Yayasan Indonesia CERAH and the Institute for Policy and Development (Poldev) Unitrend, Universitas Gadjah Mada (UGM) launched our latest report titled "Public ...

02 February 2024

footer yayasan